// Services · Implement

Integration & Rollout.

We install, connect and roll out: from site survey to running platform. Our team runs your integration project from start to finish.

Site survey · Network architecture · Configured gateways · LIMS/ELN integration · Training · Documented handover

Engineer in a white lab coat and safety glasses leaning over a lab bench to connect cables to the back of a rack-mounted instrument, holding a wiring sheet, with fibre-optic patch leads and benchtop devices in the foreground

// Full service

Get SynConnect running in your lab

We deliver the full service for your SynConnect setup. We install the hardware, connect your instruments, integrate your lab systems and train your team.

The list below shows what a project can include.

// Deliverables

What we deliver

  • Site survey and network architecture design: we map your equipment, connectivity and network layout
  • Configured SynConnect hardware: Gateway 2, Gateway Touch and SmartCable (coming Q1 2027), installed, configured and tested
  • Data integration with your lab systems: LIMS, ELN, MES and ERP. See LIMS and ELN Integrations for the patterns we use
  • Your first Node-RED workflow, built together: we build the first flow with your team, and your team owns the flows that follow
  • Data delivery to your cloud or servers: Data Suite writes your data into your cloud (AWS, Azure, Google Cloud, OVHcloud or IONOS) or onto your own servers. You keep the account, the bill and the data
  • Training for your team: so your team can run and extend the platform after handover
  • Documented handover: operating runbooks, configuration references and support contacts

On request: a 3D digital model of your setup for a digital twin. We scope the model with you.

You stay in control during rollout. We can set up your gateways before they ship. You manage them on your own network, and our support works with you by phone and screen-share.

We agree the right mix for your project with you.

// Timeline

Around 90 days to a working platform

  • Your project plan sets out the steps and the timeline for your setup.
  • Your scope sets the timeline: a single bench, a whole lab or a multi-site, regulated deployment.

// Project steps

How your integration project runs

Step 1

30-minute first call

We talk through your lab and what you need.

Step 2

Project plan

A scoped plan for your setup, ready for your team to review.

Step 3

Rollout and handover

We install, connect and integrate to the agreed plan, then hand over your running platform.

The plan you review is the plan we work to.

Integration & Rollout in numbers

3
Steps: first call, project plan, rollout
90
Days (approx.) to a working platform in your lab
30
Minutes for your first call with our team
80+
Instruments in our Connector Library

Planning a rollout in your lab? Talk to us.

Send us your instrument list, target systems, regulatory context and rollout timeline. We use it to prepare your first call with our team.

    Scientist in a lab coat explains something with open hand gestures to a listening colleague in a laboratory

    // Related pages

    Works well with this service

    Integration

    LIMS integration

    Six documented connectivity patterns for LIMS integration. We scope the integration with your LIMS with you, and your workflows grow on the same patterns.

    Service

    Custom Connector Development

    A connector for your instrument. Two days for a well-documented device. We scope complex devices with you.

    Service

    Training & Onboarding

    Workshops and product training for your team, remote or on site. We agree the format with you.